Lastly, link the chiller on the plant applying metallic or bolstered hose connections. Make sure all connections are limited and protected before beginning up the system. Mounting the Unit: Validate which the structural guidance is able to dealing with the chiller's bodyweight and vibrations. Alignment is vital for optimum operation https://www.penmann.co.uk/penmann-delivers-permanent-glycol-chiller-solution-for-ambrosia-creamery-in-lifton/