Originally, the Jai Hind metro station was prepared to be elevated. Nevertheless, the AAI objected which the elevated stretch up to the airport may pose a risk to aircraft, Hence the route was even further reworked plus the station was shifted underground, one hundred fifty m in the Airport terminal setting https://ricardohxkva.designertoblog.com/63508537/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf